PNG HAUSPLES construction Highlights
TOP FLOOR ROOFING INSTALLATION AND GROUND FLOOR INSTALLATION
7th January to 12th January 2023
As shown in the images below, top floor roofing has already been installed along with the installation of the ventilation pipes.