PNG HAUSPLES construction Highlights

TOP FLOOR ROOFING INSTALLATION AND GROUND FLOOR INSTALLATION

7th January to 12th January 2023

As shown in the images below, top floor roofing has already been installed along with the installation of the ventilation pipes.

Reply

X